Guides

Moving Into Your New Dubai Home: A Checklist

TRPE Team
Updated 12 Nov 2026 · 4 min read
Moving Into Your New Dubai Home: A Checklist

Do three things before you move a single box: register the DEWA account, book the move in permit and service lift with building management, and inspect the property with the handover checklist in hand. If you are renting, make sure the lease is registered on Ejari too. Everything else can wait a week.

Most moving day problems in Dubai are not about furniture. They are about access, permits and utilities that nobody arranged.

What has to be done before moving day?

TaskWhenWho
Register DEWA in your name2 to 3 days beforeYou
Set up cooling account if billed separately2 to 3 days beforeYou
Move in permit and lift booking3 to 7 days beforeBuilding management
Ejari registration on the tenancyAt contract stageLandlord or agent
Internet and TV installationBook a week aheadYou
Access cards and parking permitMove in weekBuilding management
Property inspection and snag listBefore you unpackYou

Do you need Ejari before you move in?

If you are renting, yes: the tenancy should be registered on Ejari, the Dubai Land Department's lease register, at contract stage. The DLD Ejari page covers registration and renewal; the fee is AED 177.75 online through Dubai REST or the DLD website, or AED 220 at a trustee centre. Ask the landlord or agent who is registering it, and keep the certificate with your move-in papers.

Why does the move in permit matter so much?

Most buildings will not let a removal team past reception without an approved move in permit, and many restrict the hours and require the service lift to be booked and padded. Some also require a refundable deposit against damage to common areas. Ask for the rules in writing when you collect the keys, because the removal company arriving to a locked service lift is the single most common moving day failure.

Villa communities are easier but often still require security to be notified and have quiet hours.

What should you inspect before unpacking?

Walk the property empty, with the lights on and the water running, and write down everything. Photograph what you find and send it to the landlord or developer the same day, because a defect reported on day one is theirs and a defect reported in month two becomes an argument.

  • Air conditioning in every room, including how long it takes to cool.
  • Every tap, drain and flush, and under the sinks for leaks.
  • Water heater, and the pressure in the shower.
  • All sockets, switches and light fittings.
  • Windows and balcony doors: seals, locks and any cracking.
  • Kitchen appliances, including the oven and the extractor.
  • Any staining on ceilings, which usually means a leak from above.

If you have bought new, this is your snagging inspection and it is worth paying a company to do it properly. See snagging and handover in Dubai.

How long is a new home covered for defects?

For a unit in a jointly owned building or community, Article 40 of Law No. 6 of 2019 makes the developer liable for one year from handover of the unit to repair or replace defective installations, such as mechanical and electrical works and plumbing, and for ten years from the project's completion certificate for defects in the structure. Report problems in writing and keep the date, because the one-year clock starts at handover, not at move in.

What paperwork should you keep?

Keep the tenancy contract and the Ejari certificate, the DEWA account number, the move in permit, the inventory or handover form signed by both sides, and the photographs from your inspection. If you are renting, that set is what protects your deposit at the end of the tenancy: under Articles 20 and 21 of Law 26 of 2007 the landlord must refund the deposit, or what remains of it, and you must hand the property back in the condition you received it, except for ordinary wear and tear. Your day-one photographs are the proof of that condition. Our tenant guide explains how deposits are returned, and getting your deposit back covers the end of tenancy in detail.

What do people forget in the first month?

  • Updating the address on the tenancy for visa and bank records.
  • Registering for the community app or portal where maintenance requests are logged.
  • Checking whether contents insurance is required by the building, and getting it either way.
  • If you own the home, checking the building's service charge against the DLD service charge index and finding out how the owners association logs requests.
  • Testing the smoke detectors and finding the water shut off valve.
  • Asking who to call for maintenance, and whether it is included in the rent.

Who fixes what once you are in?

In a rental, the split between landlord and tenant is set by the contract. Where the contract says nothing, Article 16 of Law No. 26 of 2007 makes the landlord responsible during the lease for maintenance and for repairing any defect or damage that affects your use of the property. In practice tenants usually handle minor consumables. Agree it in writing before a problem appears, and read who pays for what in a Dubai rental.

If you are still choosing the property, browse what is available to rent or to buy, and ask us about the building's move in rules before you sign.

Buying or renting in Dubai?

Have a question about this guide? Ask one of our agents on WhatsApp.

Frequently asked questions

What do I need to arrange before moving into a Dubai apartment?

Register the DEWA account two to three days ahead, set up a cooling account if chilled water is billed separately, book the move in permit and service lift with building management three to seven days ahead, and arrange internet installation about a week ahead.

What is a move in permit in Dubai?

An approval from building management allowing your removal team access, usually with restricted hours, a booked and padded service lift and sometimes a refundable deposit against damage to common areas. Most buildings will not let a removal team past reception without one.

What should I inspect before unpacking?

Air conditioning in every room, every tap, drain and flush, under the sinks for leaks, the water heater and shower pressure, all sockets and light fittings, window and balcony seals and locks, appliances, and any ceiling staining. Photograph everything and send it to the landlord or developer the same day.

Who pays for repairs in a Dubai rental?

Unless the contract says otherwise, Article 16 of Law 26 of 2007 makes the landlord responsible during the lease for maintenance and for repairing defects that affect your use of the home. Tenants usually handle minor consumables. Agree the split in writing.

How long is a developer responsible for defects in a new Dubai home?

For jointly owned property, Law 6 of 2019 (Article 40) makes the developer liable for one year from handover for defective installations such as electrical, mechanical and plumbing works, and ten years from the completion certificate for structural defects.

Free property valuation

Own a home in Dubai? See what it is worth.

Free, instant valuation from real DLD transactions.

Value my home

Handpicked for you

Featured Properties

View all properties →
TRPE Real Estate

Get new listings & market insights

Office 1201, Ascott Park Place, Sheikh Zayed Road, Dubai · Mon to Sat, 9am to 6pm

©2026 TRPE Real Estate. All rights reserved.

TRPE Real Estate is a company registered in Dubai, United Arab Emirates. Trade License No. 999314 · RERA ORN 28357. Regulated by the Real Estate Regulatory Agency (RERA).